SIMS 213
Spring 2003

 Home
 
 Assignment 1:

   Project Proposal

 
 Assignment 2:

   Personas & Task Analysis

 
 Assignment 3:

   Scenarios & Initial Design

 
 Assignment 4:

   Low-fi Prototype & Test

 
 Assignment 5:

   Interactive Prototype 1

   Interactive Prototype 1 Presentation

 
 Assignment 6:

   Heuristic Evaluation

 
 Assignment 7: 

   Interactive Prototype 2

 
 Assignment 8: 

   Pilot Usability Study

   Final Presentation
 
 Assignment 9:

   Interactive Prototype 3

 
Work Distribution


SIMS 213 Assignment 6 � Communications Spectrum
Heuristic Evaluation
April 10, 2003

 

For this assignment, we completed a heuristic evaluation of the Tele-Bears Redesign Project. Below are links to the final heuristic evaluations.

Our Group Evaluation of the Tele-Bears Redesign Project

Group Heuristic Evaluation
Summary Report

Individual Evaluations

Peter
Erick
Maria
Emily

Work Distribution

 

The Tele-Bears Redesign project team also performed heuristic evaluations for our first interactive prototype. Below are the links to their final heuristic evaluations.

Tele-Bears Group Evaluation of the Spectrum Project

Assignment Page
Group Heuristic Evaluation
Summary Report

Individual Evaluations

Kim
Nadine
Zhanna
Anna
Amy