|
|
|
Project Proposal |
|
Personas, Goals, and Task Analysis |
|
Scenarios, Competitive Analysis, and Initial Design |
|
|
Low-fi Prototying & Usability Testing |
Assignment
5: |
|
First Interactive Prototype |
Assignment 6 : |
|
Heuristic Evaluation of SFNight Prototype |
Assignment 7: |
|
Second Interactive Prototype |
Assignment 8: |
|
Pilot Usability Study |
Assignment 9: |
|
Third Interactive Prototype |
|
|
|
|
|
 |
Work Distribution Matrix
Project |
Mary |
Shirley |
Susanne |
Assignment 1 - Project
Proposal |
33% |
33% |
33% |
Assignment 2 - Personas,
Goals, Task Analysis |
33% |
33% |
33% |
Assignment 3 - Scenarios,
Competitive Analysis, and Initial Design |
33% |
33% |
33% |
Assignment 4 - Low-fi
Prototyping & Usability Testing |
33% |
33% |
33% |
Assignment 5 - First
Prototype
|
33% |
33% |
33% |
Assignment 6 - Heuristic
Evaluation of SFNight Prototype
|
33% |
33% |
33% |
Assignment 7 - Second
Interactive Prototype |
33% |
33% |
33% |
Assignment 8 - Pilot
Usability Study |
33% |
33% |
33% |
Assignment 9 - Third
Interactive Prototype |
33% |
33% |
33% |
Copyright © 2001 Chan, Eklund, and Trombley.
All rights reserved.
|
|