Date/Time:
Tue, 10/04/2011 - 5:00pm - 7:00pm
Clarification of traceability and work on Traceability Worksheet. 15 mins
- A five minute clarifying description, based on the email I sent out.
- Time for each team to identify 5-7 traces from their service brainstorm (10 minutes)
Ethnography Planning. 45 mins
-
- Information on how to prepare your ethnography plan (10 minutes)
- Ethnography Planning Group Workshop (35 minutes)
Break. 5 mins
Ethnography Plan Discussion. 45 mins
- Round-robin: We will rotate through team pairings (one pairing with Bob and the TAs) and give feedback on the ethnography plans.