Interest in a particular topic is made known by the consortium members either as a result of a published note or from the results of a workshop.
Either a Working Group is formed or the topic is assigned to an existing group.
A Requirements Document is drafted and approved by the first the working group and then the consortium.
All documents go through these stages: Initial Draft, Working Draft, Last Call Draft, Proposed Recommendation,and Recommendation.